Heavy-duty electric vehicle battery swapping and charging station at the Oyu Tolgoi mine site

Heavy-duty electric vehicle battery swapping and charging station at the Oyu Tolgoi mine site

2025 Substation & OHTL 📍 Umnugovi, Hanbogd

Commissioned by "Oyu Tolgoi" LLC, "Shugam" LLC executed the detailed engineering design of the infrastructure required to transition from diesel-powered heavy-duty vehicles to electric vehicles, in alignment with the objective to reduce greenhouse gas emissions.

Engineering design

  • Design of the 35 kV Overhead Transmission Line (OHTL).
  • Design of the substation equipped with two 2000 kVA transformers.
  • Design of the associated power cable lines.
  • Calculation and design of the grounding and lightning protection systems.
  • Preparation of the Material Take-Off (MTO).

Design supervision

  • Provided design supervision across all stages, including construction and installation, testing and commissioning, as well as during technical and state commission inspections.
  • Resolved technical issues that arose during the installation phase, and incorporated and approved necessary modifications into the working drawings.
Heavy-duty electric vehicle battery swapping and charging station at the Oyu Tolgoi mine site