Engineering design of the 10 MW / 42 MWh Battery Energy Storage System in Yesunbulag Soum, Govi-Altai

Engineering design of the 10 MW / 42 MWh Battery Energy Storage System in Yesunbulag Soum, Govi-Altai

2025 Solar & Renewables 📍 Govi-Altai, Yesunbulag

To reduce the peak hour load of the Western Regional Energy System, reduce line losses, and support system stability, "Tom Nar Energy" LLC implemented a project to construct a 10 MW / 42 MWh Battery Energy Storage System (BESS) in the territory of Yesunbulag Soum, Govi-Altai Province. "Shugam" LLC executed the engineering design, engineering consulting services, and design supervision for this project.

The scope of work included the following:

  • Comprehensive design of the 10 MW / 42 MWh Battery Energy Storage System (BESS).
  • Design of the 10/110 kV step-up substation with a capacity of 1×12.5 MVA.
  • Expansion design of the Yesunbulag 110/35 kV substation.
  • Preparation of the Bill of Quantities (BoQ) and detailed cost estimation for the BESS.
  • Consulting services on technical solutions, equipment selection, and procurement for the BESS.
  • Design supervision across all stages of the construction and installation works.
Engineering design of the 10 MW / 42 MWh Battery Energy Storage System in Yesunbulag Soum, Govi-Altai
Engineering design of the 10 MW / 42 MWh Battery Energy Storage System in Yesunbulag Soum, Govi-Altai
Engineering design of the 10 MW / 42 MWh Battery Energy Storage System in Yesunbulag Soum, Govi-Altai
Engineering design of the 10 MW / 42 MWh Battery Energy Storage System in Yesunbulag Soum, Govi-Altai